Pages

Powered by Blogger.

Tuesday, November 22, 2011

Room #4 update

The walls have been insulated and are now in the process of being textured. Ryan also added a wall to separate the space for the closet. After the walls are all textured and dry we will paint the room a "sand" color and hang the shelves in the closet. For the time being we are going to just use cement paint on the floor and use a large decorative rug. Eventually we will add flooring.
Closet/heater

View from the doorway.

Window that needs repaired and an ac unit.

Close up of wall texture.

0 comments:

Post a Comment